Revised Scope of Work Timeline

This diagram represents the revised timeline for the Scope of Work (SoW) from ASPIRE UAE to Microavia for the manufacture of 250 FPV Racing Drones, with User Acceptance happening after the handover and delivery of the first batch. The User Acceptance Test is scheduled to take 1 week.