This enhanced Timeline-Flowchart Hybrid diagram provides a detailed view of how Discrete Event Simulation (DES) integrates into the Engineer-to-Order (ETO) manufacturing process. It includes subgraphs for DES Simulation and DES Outputs, detailing the internal stages and outputs respectively.
Integration of Discrete Event Simulation (DES) in Engineer-to-Order (ETO) Manufacturing: Detailed Structure
—
by