{“document”: “M1 Overview: Project Management and Your Wicked Problem”, “description”: “This module introduces project management tools that will aid in planning and executing the capstone project. The module emphasizes the need to revisit the Wicked Problem and determine if it has been defined in a way that allows for the identification of an ‘entry point’ for proposing a solution. The proposed solution, along with an overview of the Wicked Problem and a description of its background, should be able to be turned into a 12-15-minute Tribe Talk presentation. The module also encourages treating the Tribe Talk like a project and using the discussed tools to identify the deliverables and tasks necessary to create a first-class Tribe Talk. The module ends with a call to action to review the readings, view the lecture presentations, review and begin the Tribe Talk, and complete the first Wicked Problem assignment.”, “module”: “M1”, “hyperlink”: “https://drive.google.com/file/d/1F5H3cz6wXwpJvCCNtdYNvFP4wAKDi_Zs/view”}
M1 Overview: Project Management and Your Wicked Problem
—
by